The East Bay Greenway is a planned, 30-mile facility connecting from Oakland to Fremont, linking between BART stations with a series of trails and protected bikeways.

Campaign Map
Click the dots to learn more about each project segment

ABOUT THE EAST BAY GREENWAY

Originally proposed in 2008 as a rail-to-trail conversion taking over the Union Pacific train tracks, the East Bay Greenway has since shifted to delivering mostly on-street bike facilities as the initial phase, adding physically protected bikeways and bike/walk trails along major corridors.

Despite an increase in the number of high quality bikeways around the East Bay, this Greenway will run through areas where the network is still sparse and good biking and walking routes are hard to come by.

By connecting between communities as well as to transit hubs this project will improve traffic safety on disinvested high-injury corridors, providing access to opportunity through healthy and sustainable, multi-modal trips.

campaign events

campaign events

Join us at upcoming events related to our East Bay Greenway campaign, to get involved and support a more people-friendly East Bay.

Major Projects
Click the city names below for project details

map of the East Bay Greenway alignment through Oakland

  • Lake Merritt to Fruitvale Protected Bikeway

Led by the Alameda Country Transportation Commission, this segment will add new protected bikeways and cycletracks following East 10th St, East 8th St, and East 12th St between Lake Merritt BART and Fruitvale BART.

The project design is complete and fully funded.

Detailed construction plans are available to view or download here (27MB), with work expected to start in early 2027.

  • Fruitvale to 54th Ave Bikeway

This City of Oakland project will bridge the gap between Fruitvale BART and a separated pathway on San Leandro Street using a combination of protected bikeways and painted bike lanes between 35th and 44th Aves, and then a traffic-calmed segment with no bike lanes between 44th and 54th Aves.

This includes a “counter-flow” protected facility allowing 2-way bike traffic on the one-way part of E 12th from 44th Ave to 40th Ave.

Detailed construction plans are available to view or download here, with work expected to start in early 2027. 

  • Coliseum BART Trail Phase 2

photo of a person riding a bike while smiling and waving, on the East Bay Greenway north of Coliseum BART in Oakland

Construction on this project is complete, and we celebrated the grand opening on June 10th, 2026!

This project includes an off-street bike/walk trail from Seminary Ave to 69th Ave, then on-street bike lanes from 69th to 75th Aves connecting to an existing trail which continues to 85th Ave.

New pathway lighting, 70 new street trees, and pedestrian crossing and traffic signal upgrades are also included.

Project info is here.

This project was highlighted by the League of American Bicyclists via their “Local Wins” update blog post!

  • San Leandro Blvd & E 14th Bikeway

This project will continue from Oakland along San Leandro Blvd and E 14th St through San Leandro.

The plan includes a combination of 2-way cycletrack, separated bike/walk pathway, directional protected bikeways, and a short paint-only bike lane segment.

The 2-mile segment on San Leandro Blvd from the Oakland border to E 14th St is fully designed and funded, and scheduled to start construction in October 2026, and will continue into 2027. The detailed construction plans for this protected bikeway project are available to review here.

The E 14th St protected bikeway segment is expected to complete design in early 2027, for a possible construction start by the end of 2027. Concept plans for the E 14th segment are available here.

map of the East Bay Greenway alignment through San Leandro

  • E 14th Bay Fair Bikeway

At the San Leandro and Ashland border, this project will continue the E 14th Ave protected bikeway further south, add several protected intersections, and a short bikeway spur connecting to Bayfair BART.

The project will connect to an existing facility on E 14th in Ashland which includes a protected bikeway in the northbound direction from 170th Ave to 164th Ave, and bus boarding islands with protected bike channels.

Concept plans are available here. The construction start estimate is 2028.

map of the East Bay Greenway alignment through Ashland

  • Mission Blvd Cherryland Bikeway

Running through the unincorporated jurisdiction of Cherryland, Alameda County Public Works will construct this mile of raised, protected bikeway along Mission Blvd between Rose St and the Hwy 238 underpass, including two protected intersections, landscaping, bus islands, and more.

Project info is here. Construction is currently underway, starting with utility undergrounding work. The full bikeway project is expected to be complete in 2028.

Concept plan overhead view of Mission Blvd protected bikeway and protected intersection at Mattox Rd

map of the East Bay Greenway alignment through Oakland

  • Lake Merritt to Fruitvale Protected Bikeway

Led by the Alameda Country Transportation Commission, this segment will add new protected bikeways and cycletracks following East 10th St, East 8th St, and East 12th St between Lake Merritt BART and Fruitvale BART.

The project design is complete and fully funded.

Detailed construction plans are available to view or download here (27MB), with work expected to start in early 2027.

  • Fruitvale to 54th Ave Bikeway

This City of Oakland project will bridge the gap between Fruitvale BART and a separated pathway on San Leandro Street using a combination of protected bikeways and painted bike lanes between 35th and 44th Aves, and then a traffic-calmed segment with no bike lanes between 44th and 54th Aves.

This includes a “counter-flow” protected facility allowing 2-way bike traffic on the one-way part of E 12th from 44th Ave to 40th Ave.

Detailed construction plans are available to view or download here, with work expected to start in early 2027. 

  • Coliseum BART Trail Phase 2

photo of a person riding a bike while smiling and waving, on the East Bay Greenway north of Coliseum BART in Oakland

Construction on this project is complete, and we celebrated the grand opening on June 10th, 2026!

This project includes an off-street bike/walk trail from Seminary Ave to 69th Ave, then on-street bike lanes from 69th to 75th Aves connecting to an existing trail which continues to 85th Ave.

New pathway lighting, 70 new street trees, and pedestrian crossing and traffic signal upgrades are also included.

Project info is here.

This project was highlighted by the League of American Bicyclists via their “Local Wins” update blog post!

  • Downtown & South Hayward Bikeway

Originally proposed to continue straight down Mission Blvd, this project was controversially pushed to side streets including Grand, Silva, and Whitman St.

This new alignment uses a combination of trails, protected bikeways, and shared bike/car lane neighborhood streets with traffic calming.

The project leads at the Alameda County Transportation Commission are still promising a high quality bikeway but Bike East Bay and our partners at Bike Hayward continue to advocate for a continuous protected bikeway on Mission Blvd as well.

Project info is available here.

 

map of proposed East Bay Greenway alignment through Hayward on Montgomery, Grand St, Silvia Ave, and Whitman St

Caltrans has allocated $44 Million in state funding for 7.7 miles of protected bikeway and other safety upgrades on Mission Blvd, from Lexington Ave in Union city to the 680 interchange in Fremont.

This project will extend an existing protected bikeway segment on Mission Blvd to the north, connecting to the rest of the East Bay Greenway segments currently in development.

Construction on the Caltrans project is estimated to start in 2028.

  • Downtown & South Hayward Bikeway

Originally proposed to continue straight down Mission Blvd, this project was controversially pushed to side streets including Grand, Silva, and Whitman St.

This new alignment uses a combination of trails, protected bikeways, and shared bike/car lane neighborhood streets with traffic calming.

The project leads at the Alameda County Transportation Commission are still promising a high quality bikeway but Bike East Bay and our partners at Bike Hayward continue to advocate for a continuous protected bikeway on Mission Blvd as well.

Project info is available here.

map of proposed East Bay Greenway alignment through Hayward on Montgomery, Grand St, Silvia Ave, and Whitman St

Caltrans has allocated $44 Million in state funding for 7.7 miles of protected bikeway and other safety upgrades on Mission Blvd, from Lexington Ave in Union city to the 680 interchange in Fremont.

This project will extend an existing protected bikeway segment on Mission Blvd to the north, connecting to the rest of the East Bay Greenway segments currently in development.

Construction on the Caltrans project is estimated to start in 2028.

project timeline chart for various East Bay Greenway segments in development, spanning between 2026 and 2030

Join our Advocacy Mailing List

Stay updated on each campaign by indicating your interests below!

Campaign Updates

Join our email list for the most up-to-date info!

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors