Pleasant Hill

Cannondale R1000 (CAAD8)

location

Pleasant Hill, CA

description

Black 20-speed aluminum road bike with Ultegra components, Ksyrium Elite wheels, Flite saddle, Look Keo pedals and black Thompsen stem.
First 2 characters of serial number:
Q0

contact

rickmartyn@gmail.com

File attachment

Jurisdiction

Raleigh Tokul 3

location

250 Coggins dr, pleasant hill ca

description

Medium, light blue with pink 'Raleigh' on frame. 27.5 wheels
First 2 characters of serial number:
U1

contact

Joe Florence 925 550 6741

Jurisdiction

What Can You Do To Save Your Online Profit Masters Snopes Barack Obama Airplane From Destruction By Social Media?

location

Italy, Anzio

description

Anzio
First 2 characters of serial number:
FY

contact

PD

Jurisdiction

Red 19' Marin Alp

location

1898 Contra Costa Blvd. outside Chase bank atm.

Jurisdiction

Help Design a Better Geary Road Bikeway

Help Design a Better Geary Road Bikeway

Take our Geary Road bikeway design survey and help us design better bike lanes along Geary Road in Pleasant Hill and Walnut Creek.

We want to hear from you about what it is like to ride Geary Road and what it could be like with the type of bike improvements you want to see. We are working with Bike Walnut Creek to improve Geary Road, as well as make many new bike improvements in the Downtown Walnut Creek area.

This is a short survey to help us gauge public support for specific bikeway improvements that can easily be added to the Geary Road project before its final design is complete. We plan to share the survey results with city staff working on the project. 

You can also submit public comments via email to:

Rod Wui, Senior Civil Engineer, City of Pleasant Hill

Scott Wikstrom, Senior Civil Engineer, City of Walnut Creek

Pleasant Hill unveils new Canal Trail Crossings throughout the City

November 21, 2012 - 4:00pm to 5:00pm

The City of Pleasant Hill has recently completed significant enhancements to six of the major trail crossings throughout the city. Mayor Hanecak and city officials will conduct a ‘switch-on’ ceremony of the signal lights:

Where:at the Canal Trail Crossing on Gregory Lane
When:Wednesday, November 21, 2012 at 4 p.m.
The public is welcome to attend the event.

Bike lane lines are worn away.

Assigned to:Ian McDonald
Created:Visitor (not verified) at July 18, 2012 - 4:03pm
Status: (Class II (bike lane) / Priority major)
Case ID:: -9931

type

bike ways (paths, lanes, routes) not clearly marked

Location

Contra Costa Blvd between Woodsworth and Doris
94523 Pleasant Hill
US

description

The bike lane lines on the south bound side of Contra Costa blvd between Doris and woodworth are no longer visable.

Jurisdiction

Contra Costa Public Workshops on Priority Projects for Regional Transportation Plan: Pleasant Hill

April 21, 2011 - 9:00am to 11:00am

Want to see more bike/ped bridges get built over freeways and busy roadways in Contra Costa?

RTP logoNow through April is cyclists’ time to ask the Contra Costa Transportation Authority (CCTA) for ‘big-ticket’ bike projects in the upcoming Contra Costa Countywide Transportation Plan-a 25-year planning document that is part of the Regional Transportation Plan “Call for Projects.” We are looking for “big ticket” projects of at least $1 million here.

sharp bump on oak park blvd over 680 freeway

Assigned to:Unassigned
Created:Visitor (not verified) at January 30, 2011 - 9:19am
Status: (other / Priority minor)
Case ID:: -8393

type

pothole or pavement cracks

Location

oak park blvd
94523 pleasant hill
US

description

The shoulder on Oak Park Blvd in Pleasant Hill where the road passes over the 680 freeway has a sharp bump for bicyclists. The height of the roadway changes on the overpass compared to the road leading up to the overpass causing a sharp bump that runs the entire width of the shoulder (bike lane). This problem is present in both directions (eastbound and westbound). The sharp bump is perpendicular to the direction of travel leading to a sharp jolt when hitting it on a bicycle.

Jurisdiction

Advocacy Ride: Pleasant Hill

February 27, 2011 - 10:00am to 1:00pm

Pleasant Hill logoAdvocacy Ride
Sunday, February 27, 2011
10am Pleasant Hill BART Station
Join us for a short and easy ride through the City of Pleasant Hill where Bicycle Coalition members and supporters will take a look at some of the challenging projects proposed for the new Plan, as well as some of the successes

Meanwhile, take this timely opportunity to provide your good ideas on the <a href=”

Pages

Subscribe to Pleasant Hill