Climate Ride Training Ride -- Two Bridge Loop

Saturday, July 21, 2012 - 9:00am to 1:00pm

Two Bridge Loop starting at 9:00 AM at El Cerrito del Norte BART and ending at North Concord BART. We'll cross the Carquinez bridge into Vallejo and return via the Benicia Bridge. Two routes are available, one 40 miles, and the other 49 miles. We'll choose the route (or split the group) at the start. We'll stop for lunch at a taqueria near North Concord BART. Cue sheets will be provided at the start. Bring water & snacks. Helmets required. Greater than 30% probability of rain will cancel.