Saturday, April 21, 2012 - 10:00am to 3:00pm
(THIS RIDE HAS BEEN CANCELLED DUE TO SCHEDULE CONFLICTS. IT WILL BE RESCHEDULED AT A LATER DATE) Meet at 10am for a two bridge loop starting at North Concord BART, 40 miles. We'll ride through Martinez, across the Benicia Bridge, and on through Benicia and Vallejo. Return across the Zampa Bridge through Crockett, the Carquinez Scenic Drive and back to Martinez and the BART station. Cue sheets will be provided at the start. Bring water & snacks. Helmets required. Greater than 30% probability of rain will cancel.