EBBC members provide great ideas for the Fremont Bicycle Master Plan

Author: bcomadmin

Date: August 26, 2011

fremont logo

Thank you to all of our members and volunteers for your help and input on developing the official comments of the East Bay Bicycle Coalition on the Draft Fremont Bicycle Master Plan. We received a lot of great ideas from enthusiastic EBBC members on the draft Plan, our members attended several meetings of the Fremont Bicycle Advocacy Meeting to review the plan, over 250 bicyclists responded to the City’s online web survey about the Plan, and the East Bay Bicycle Coalition hosted an advocacy ride in August to survey streets in Fremont for the potential to improve conditions for bicycling. On August 25, EBBC provided the following comments as our organization’s official response to the draft Bicycle Master Plan and look forward to the adoption and full implementation of the Plan.

First, we commend the City of Fremont for installing as many bike lanes as they have to date and also in the Plan for including many more miles of bike lanes, which once installed will complete an extensive network of separated space for cyclists from cars. Of course, intersections still pose a major challenge to design for safe bicycle travel, and the speeds of traffic on Fremont Streets is way to high and posed a safety risk. For this reason, we feel that the Bicycle Master Plan could include a stronger traffic calming/traffic awareness element that is also part of the implementation plan.

We also applaud the Plans inclusion of colored bike lanes for conflict zones. This roadway marking treatment is now approved in California and we strongly urge Fremont to start implementing colored bike lanes for all of the conflict zones of bicycle travel.

Right turn lanes: the Plan’s designs for thru bike lanes and right turn lanes needs to be substantially improved. At these locations, the bike lane should be striped continuously, so that the motorist is required to drive over (or across) the bike lane. Such a movement will significantly increase the awareness of bicyclists. The current design of Figure 7-11 is too weak and needs upgrading. Also, colored bike lane treatment would significantly help.

The Mission Boulevard undercrossing at the railroad tracks needs signage in addition to the proposed curb cuts. This stretch of roadway also needs some traffic calming elements to improve the safety of bicyclists.

We applaud the City for the Plans inclusion of a multi-use pathway thru Central Park and extending south along the proposed BART right-of-way. This will be a highly used public facility and will also greatly increase the connectivity of the Fremont bicycle network.

We applaud the Plans proposed bicycle signage. Oakland has taken the lead on this and it is great to see other cities following this lead and creating a more uniform signage system in the East Bay.

We urge Fremont not to use Sharrows, without additional traffic calming/motorist awareness treatments that slow down traffic speeds to 25mph or less. One treatment we propose is the “super sharrow,” which Long Beach has spearheaded. This is a sharrow design with a wide green colored travel lane for cyclists. It has been a success in Long Beach and is approved provisionally in California.

We applaud the Plan for encouraging the City of Fremont to develop a Complete Streets Policy. The region is discussing having such a requirement for its Block Grant Program. Thus, it makes sense for Fremont to have this policy in its own bicycle plan.

We urge Fremont to conduct a feasibility study of completing a multiuse pathway along the BART right of way between Niles and the Fremont BART Station. This segment, once completed, will provide a direct connection from the North to Fremont BART and will also extend the East Bay Greenway south to the pathway along the southern BART right of way.

Sequoia is a good connection between the Alameda Flood Control Pathway and Centerville. The Plan should include a tunnel under train tracks connecting to Centervile from the Alameda Flood Control Pathway.

Blacow has great potential as a north-south bikeway for much of the length of the City. There needs to be bikeway connections between the frontage road segments, which provide a direct bikeway along the corridor, and this design needs to be on both sides of the street. A variety of cut-thrus for bikes and improved cross street crossing designs are also needed to complete this bikeway.

We applaud the City of Fremont for addressing the porkchop problems at intersections. All porkchops need to be narrowed or eliminated, with bike lanes that are connected with dashed lines from the pork chops to the bike lanes extending away.

The Peralta & Paseo Padre intersection needs a two-way bikeway from the Flood canal channel spur to this intersection, with either a box-turn treatment with advance bike box, or a bike signal head.

Fremont Blvd needs bike lanes the entire length, including in Centerville (lose the center turn lanes). We applaud the Plan for including bike lanes on Fremont Blvd and strongly urge that these bike lanes be continuous and wide for safe bicycle travel.

Warren Blvd needs it’s bike lanes fully and properly striped for its entire length. We realize this may be a Caltrans issue, but the City of Fremont should support improving these bike lanes.

Irvington BART Station: this new station is right next to Washington & Osgood intersection. There needs to be better walking and biking conditions than currently exists and that are going to exist after Osgood is finished

Buffered bike lanes are needed on high speed roadways, like Paseo padre and Thornton Ave. Where speeds exceep 35mph, separation of the bike lanes from high speed traffic is necessary for safe travel and to encourage more people to commute by bike. The NACTO Urban Bikeway Design Guide has many good recommendations for separated bikeways that other US cities are implementing at a rapid pace.

We also urge you to improve the Implementation section of the Plan to include a more detail timeline for which projects are planned to be constructed during which years. We realize things change, but City staff need the support of a solid implementation plan in order to justify their workplans on bike projects and to allow the public to gauge how good a job staff are doing. In otherwords, it is very useful for the public to know which projects to expect construction on during the next 2-5 years, at least. Please improve the implementation section.

Thank you very much for considering our comments and incorporating them into a revised final Fremont Bicycle Master Plan. Please do not hesitate to contact me with any questions you may have about this letter and the concerns and ideas we share herein.

City of Fremont’s Response to Public Comment on the Draft Bicycle Plan

DATE: September 20, 2011

TO: BPTAC Members

FROM: Rene Dalton

SUBJECT: Additional Revisions to Draft Bicycle Master Plan

The following are additional revisions to be included in the Draft Bicycle Master Plan which

incorporates public comments received, BPTAC comments and Recreation Commission

comments received. The final draft of the Bicycle Master Plan will be released later this month

and will incorporate the revisions described below. Please contact me for any questions you may

have. Thank you.

General Comments

1. The following projects from the Pedestrian Master Plan will be added to the Bicycle

Master Plan Projects List: 1) Fremont Boulevard to Dixon Landing Road Trail (see also

Bay Trail write-up from Questa previously submitted), 2) Hetch Hetchy Trail

Enhancement Study, 3) UPRR Trail Project. The Greenbelt Gateway Grimmer Boulevard

project sheet from the 2007 Pedestrian Master Plan will be revised and be included in the

Bicycle Master Plan project sheets.

Chapter 7 Comments

1. On page 7-5, Figure 7-3 map, proposed class 1 trail alignment for the East Bay

Greenway as (along the BART alignment/ROW) through the Niles Area up the

Fremont BART as shown in the Draft ACTC Bike Plan update will be added to the

Plan. A project description would be to conduct a trail feasibility study along the

BART right of way between Niles and the Fremont BART Station.

2. On page 7-18, Table 7-6, it appears minimum long term parking requirements for

Senior Housing (.5 bike parking space/bedroom) appears high, parking rate to be

adjusted.

3. On page 7-3, Index Map Figure 7-1, index map grid box for Map Figures 7-2 to 7-4 to

be added.

4. On pages 7-4 to 7-6, Map Figures 7-2 to 7-4 , Ridge Trail alignment on the maps were

applicable will be added.

Bike Master Plan Revisions Page 2 of 3

September 20, 2011

5. On page 7-6, Figure 7-4, a proposed trail on the south side of Auto Mall Parkway

between Nobel Drive and UPRR tracks will be added. A City park is proposed

adjacent to the proposed new trail on the south side of the unimproved parcel. Maps

will be revised to show a Transit Center and Park and the text “ACE Transit Center”

will be deleted.

6. On page 7-8, Table 7-2, location for E. Warren Avenue between Mission Boulevard

and UPRR Tracks will be deleted.

7. On page 7-8, Table 7-2, for E. Warren Avenue between Warm Springs Boulevard and

Kato Road, “E.” for Warren Avenue location will be deleted.

8. On page 7-13, Section 7.3.2, third paragraph, a statement will be added stating the

intersections considered for removal of free right turn lanes where the level of service

operations is not acceptable or near unacceptable level of service operations a traffic

study or traffic evaluation would be required and thereafter a determination will than

be made “to proceed or not to proceed” with the removal of the free right turn lane

based on balancing safety and traffic delay.

9. On page 7-13, Section 7.3.2, bullet point for Peralta Boulevard/Paseo Padre Parkway

will be added.

10. On page 7-13, Figure 7-11 shared bike lane right turn diagram will be modified so that

the bike lane is continuous to the limit line. Typically there is a gap between the

transition area, revise the figure so that the bikeway is dashed and continuous through

the gap area.

11. On page 7-14, Section 7.3.3 Mission Boulevard/UPRR undercrossing south of

Stevenson Boulevard, the project description will be revised to include installation of

appropriate bikeway signs.

12. On page 7-15, 7.3.6, Blacow Road Union Pacific Railroad Overcrossing Study

description, for the second paragraph, delete the last sentence which reads “The City is

currently working with the CPUC and UPRR to move this project forward.” Modify

the last sentence of the section to read as follows: This Plan recommends the City

conduct a study as an initial step in determining the benefits, constructability,

constraints and opportunities in the construction of a grade separated crossing.

13. On page 7-15, add section 7.3.7 Sequoia Road/UPRR Bicycle and Pedestrian Grade

Separated Crossing Study. The proposed bicycle and pedestrian grade separated

crossing at the UPRR tracks will connect Alameda Creek Trail and Quarry Lakes

Regional Park to the Centerville Train Depot via Paseo Padre Parkway, Sequoia Road

and Alameda Creek Trail Bridge crossing at Sequoia Creek Terrace. The Plan

recommends the City conduct a study as an initial step in determining the benefits,

constructability, constraints and opportunities in the construction of a grade separated

crossing. Project should be ranked in Tier 2 or Tier 3 for consideration as a long term

project.

14. On page 7-15 add section 7.3.8, I-880/South Fremont Bicycle and Pedestrian

Overcrossing Study. The Plan recommends the City conduct a study as an initial step

in determining the benefits, crossing alignment/location, constructability, constraints

and opportunities in the construction of a grade separated crossing. Project should be

ranked in Tier 2 or Tier 3 for consideration as a long term project. It appears that the

completion of Fremont Boulevard extension project to Dixon Landing Road would

make this a higher priority project.

Bike Master Plan Revisions Page 3 of 3

September 20, 2011

15. On page 7-17, Section 7.5.2 Bike Parking Recommendations, “Organize Bicycle Valet

Parking at special events such as Festival of Arts will be added.

16. On page 7-19, Section 7.6.1, the first paragraph will be revised to state that the City’s

General Plan has a Complete Streets Goal and Policy in the Mobility Element, Goal 3-

1 and accompanying policies.

Chapter 9 Comments

17. The following new project “Bicycle & Pedestrian Access Way from Fremont BART

Station to Downtown.” will be added in the Projects List as a Tier 1. The project will

expand and enhance bicycle and pedestrian pathway from Fremont BART Station to

downtown area’s commercial and employment centers at Liberty Street. The

estimated cost is $650,000.

*****************************************

August 1, 2011 update

Do you bike around Fremont regularly? Would you like to bike more but find the roadways challenging? Join us for our first:

Fremont Advocacy Bike Ride

Sunday, August 7, 10am-2:00pm. Meet at Fremont BART. Interested cyclists are invited to join the East Bay Bicycle Coalition on a tour of potential bikeway improvements in Fremont. The ride will stop at several locations to discuss key bikeway improvements needed to make Fremont a better city for bicycling. Bring a lunch or plan to grab a bite to eat after the ride.

The Advisory Committee reviewed the draft plan at its July meeting and pointed out several areas that need significant bike improvements:

  • safe bike crossings of I-880, particularly to the south for commuting to Silicon Valley. The Dixon Landing crossing of I-880 is the preferred crossing, but is extremely challenging and dangerous in its current configuration. Caltrans is reviewing this freeway intersection for potential improvements. For more info, contact Ina Gerhard.
  • completion of the East Bay Greenway from Union City, along the BART right-of-way, to Fremont BART
  • a good north-south bikeway connection along Blacow Rd
  • good bike access to the proposed new BART stations at Irvington and Warm Springs

What’s are your top priorities? Add to this blog and the Bicycle Coalition will share your ideas with the city planners of Fremont.

The purpose of the plan update is to identify community needs, identify new projects and determine program needs. The City wants you to share your thoughts! Your responses will help us plan for community needs.

Please take a few minutes and fill out our survey:

www.surveymonkey.com/s/8Y2D5G9

The survey will be open until March 14, 2011.

Sincerely,

Rene Dalton

City of Fremont

Transportation & Operations Department

39550 Liberty Street

P.O. Box 5006

Fremont, CA 94537-5006

tel. (510) 494-4535

fax (510) 494-4751

New e-mail: rdalton@fremont.gov